







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Mr-Glass Home Additions & ADU: The Paradise Owner’s Guide
Sawyer Remodeling Paradise builds and installs Mr-Glass-compatible home additions and ADUs, and the installed price in Paradise runs $45,000 – $130,000 for an addition and $90,000 – $220,000 for a detached ADU. We’re an independent service provider and we’re not affiliated with Mr-Glass, so we source compatible systems and match them to your home’s existing footprint rather than a single catalog. Most Paradise owners find out something is wrong the same way: a rear wall that reads warm to the touch in July, a sliding door that won’t seat, or a roofline that’s visibly out of plane a season after a rushed build.
This page covers the parts and systems behind that failure, what a real fix costs, and what we will not pretend you can do yourself.
Key Takeaways
- Addition installs in Paradise: $45,000 – $130,000. Detached ADUs: $90,000 – $220,000. Garage conversions: $30,000 – $80,000.
- Any company that regularly works in Paradise has to deal with it: the Las Vegas Valley sits in a high-wind and extreme-heat zone, and addition tie-ins fail at the roof-to-wall joint and door thresholds first.
- Structural tie-ins, roof flashing, and gas or electrical work are not homeowner jobs. Say it plainly and get it inspected.
- Written price before any work starts. 365-Day Done Right Promise on every project.
Which Mr-Glass Models This Applies To

Mr-Glass has sold addition and enclosure systems across several series lines, and the part that matters most in Paradise is the tie-in kit: the flashing, fasteners, and threshold hardware that marry a new structure to an existing wall. Older series used a thinner gauge of header track and a single-seal threshold; later series moved to a wider flange and a two-seal threshold with a thermal break. If your structure predates that change, a later-series threshold won’t seat without modification, and that mismatch is one of the most common reasons a “direct replacement” leaks within a year.
Identify your system before you buy anything. Look for the manufacturer label on the interior face of the header or inside the door jamb, not on the exterior skin, where Paradise sun fades it to nothing in a few summers. Measure the exposed flange width, the threshold height, and the header depth. Those three numbers tell us which series you have.
On the OEM-versus-aftermarket decision: for structural connectors and flashing, we buy OEM or an equivalent rated to the same load and corrosion spec. For trim, thresholds, and seals, a quality aftermarket equivalent often outlasts the original when it’s spec’d for desert UV exposure. We won’t put a $12 generic threshold on a $60,000 addition and call it done.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your Mr-Glass Home Additions & ADU Is Failing
- Water staining at the ceiling-wall joint. The roof-to-wall flashing has lifted or the sealant has baked out. In Paradise, that seam sees surface temps well past 150°F in summer, and standard sealant fails in two to three years where a properly detailed flashing wouldn’t.
- A sliding or French door that won’t latch cleanly. The threshold has settled or the frame is out of square. Vegas Valley soil movement on slab edges causes this more than hardware failure does.
- Interior wall warm to the touch or a room that won’t cool. Missing or compressed insulation at the tie-in, or a thermal break that was never installed. You’ll notice it in July and forget it in November.
- Visible gap or daylight at the base plate. Anchoring has backed out or the original fasteners were undersized. This one is structural, and it’s the failure we see most on rushed Paradise builds.
- Drywall cracks radiating from the addition corner. Differential movement between the new footing and the original slab. Sometimes cosmetic, sometimes the first sign the tie-in was never engineered.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included

Installed pricing in Paradise:
| System | Installed Range |
|---|---|
| Home Addition | $45,000 – $130,000 |
| ADU Construction | $90,000 – $220,000 |
| Garage Conversion | $30,000 – $80,000 |
What drives the range: square footage, whether the addition needs its own bathroom or kitchenette, footing and slab work, and how much of the existing wall has to be opened for the tie-in. A partial system failure that only needs new flashing, threshold, and connectors sits well below the bottom of these ranges. A full rebuild where the structure was never engineered sits at or above the top.
You get a written line-item price before any work starts. The number on your invoice is the number you approved. Every project carries the 365-Day Done Right Promise: if the work isn’t right, we make it right, in writing, for a full year after close. Our technicians have up to 21 years of experience, and they’re background-checked and uniformed before they knock.
DIY or Call Us?
What you can safely check yourself: photograph the label, measure the flange and threshold, and note where water is showing up. That’s diagnosis, and it’s genuinely useful.
What you should not touch: roof flashing on a steep pitch, structural anchoring, and anything involving gas or electrical to the addition. A tie-in that fails at height or under load is a real hazard, not a weekend project, and no honest trade will tell you otherwise. If your structure is showing daylight at the base plate or you’ve seen water at the ceiling joint, stop and call.
Call (866) 977-0526 to schedule a free estimate. We’ll tell you whether you’re looking at a repair or a rebuild, and we’ll put the price in writing before anyone lifts a tool. We also service KraftMaid, Cambria, and Silestone cabinetry and surface work if your addition needs finishes.
FAQs

A properly installed addition should hold 30 to 50 years on the structure, but the tie-in components are the weak point in Paradise: flashing and sealant typically need attention every 8 to 12 years here, versus 15 or more in milder climates, because of the heat and wind. The structure is fine. The detail at the joint is what wears out.
Yes, often. If the frame and anchoring are sound and only the flashing, threshold, or seals have failed, a targeted repair runs a fraction of a full rebuild. If the structure was never engineered or the anchoring has pulled, repair isn’t honest and we’ll tell you.
A threshold and flashing repair is typically one to two days. A partial system replacement runs three to five days, and a full addition install runs weeks to a few months depending on size and permitting. We’ll give you a real timeline in the written estimate, not a guess at the door.
We identify your series from the label and measurements, then source OEM connectors and flashing to the original spec, or a rated aftermarket equivalent for trim and seals. We don’t claim to stock parts or carry them on a truck; we source to your model and confirm the part before the install date.
Written by the team at Sawyer Remodeling Paradise, serving Paradise and nearby areas.












